RESOURCE RECOVERY FACILITYHennepin County, MN

Project Scope

Scope included the design, construction, and operation of a waste-to-energy facility with the capacity to process 365,000 tons of waste per year. Plant includes two solid waste combustion systems. each having a capacity of 600 tons per day; two natural circulation heat recovery boilers producing 288,250 pounds per hour at 650 psig and 750 degrees F; a 38-MW turbine generator; two dry scrubbers and two high efficiencty baghouse collectors; and a refuse storage bunker with storage capacity of 8,309 tons of solid waste.

PROJECT FACTS:

CLIENT
Hennepin Energy Resource Co.


CORE MARKET
Power & Industrial


SERVICE
Design/Build