Aerial Gunnery Range

Project Scope

Caddell was responsible for the construction of a training range encompassing a total of approximately 2,000 acres with extensive sensitive and protected wetland areas. Caddell constructed stationary infantry targets, moving infantry targets, stationary armor targets, moving armor targets, single and two story facades, urban cluster, range limit markers, camera towers, gravel roads, asphalt roads, concrete turning pads, vehicle staging area, bivouac tent pads, downrange electrical and communications, range control tower, after action review building, operations/storage building, bleacher enclosure, covered mess, latrine, ammunition breakdown building, storm drainage, earthwork, erosion control, clearing and grubbing, and targets on the ground for aerial bombing and live fire aerial gunnery practice.

Client

U.S. Army Corps of Engineers